Installation of approximately 700 LF of 8-inch PVC water line, 650 LF of 8-inch PVC sewer line, 1,200 LF of 14-inch insulated steel pipe (chilled water line) on the SRP-MIC Government Campus with various points of connection to existing infrastructure. The location of this project required strict adherence to public safety.